How should I configure scheduled tasks in Plesk control panel to make it run every 30 minutes instead of only at a specified time? I use plesk 9.3.0…
Run Scheduled Tasks once every 30 minutes
scheduled-task
scheduled-task
How should I configure scheduled tasks in Plesk control panel to make it run every 30 minutes instead of only at a specified time? I use plesk 9.3.0…
Best Answer
Use crontab: http://www.domaincheck.co.uk/plesk9-crontab.htm And set it to 30 minutes, and to all the other fields enter *
Well, of course enter the command in the command field :)